CQI-12-2011-3-24"All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements."

Item # "Related
CSA Question #" Category/Process Steps Control Monitoring
1.0 AQUEOUS CLEANING PROCESS (Alkaline or Acid)
A1.1 1.4 There shall be an incoming part assessment procedure with criteria. Per Control Plan Per lot
2.0 Cleaning Bath(s)
A2.1 2.11 The following checks shall be performed during production:
A2.2 "1.4
2.11
2.12" Pressure/Agitation Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
A2.3 "1.4
2.11
2.12" Temperature Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
A2.4 "1.4
1.6
2.11
2.12" Time Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
A2.5 "1.4
1.6
2.11
2.12" Chemical Concentration Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
A2.6 "1.4
2.11
2.12" Impurity Content (e.g. acid split) Manual Per Control Plan/Log Sheet (1/shift minimum)
关于 CQI一12一2011一3一24 的使用提示: 本文件为 机械技术文档 资源,格式 zip,大小 44.39K。 由 53368260 于 2013-04-20 上传。仅供学习参考,不得商用。 侵权问题请联系 帮助中心
资源下载
立即下载
需要 1 积分
文件信息
53368260
53368260
发送消息

文件格式 zip
文件大小 44.39K
下载次数
更新时间 2013-04-20
53368260 的其他文件